VGSF CONSTITUTIONAL TECHNICAL ARCHITECTURE — BOOK II — PART B: CONSTITUTIONAL ENGINEERING METHODOLOGY
Chapter 7 of 8 in this Part
M7 — Corrective Cycle Doctrine
Document record
| Field | Value |
|---|---|
| Constitutional Series | M — Constitutional Engineering Methodology |
| Primary Source | CORRECTIVE_CYCLE_STANDARD.md |
| Version | V2.1 (CAP030C, 2026-06-15) |
| Ratified | RATIFIED — CAP027B (Methodology V2.0) + CAP030C (V2.1 Phase -1 amendment) |
| Applies To | REF003–REF014 |
| Position in Book | Part B, Chapter 7 of 8 |
M6 established verification execution and certification. M7 (Corrective Cycle Doctrine) establishes the constitutional path when verification fails — the Phase 5a corrective cycle that preserves role separation through implementation failure and independent re-verification.
§1 — Document Identity and Purpose
Document: CORRECTIVE_CYCLE_STANDARD.md
Date: 2026-06-14
Authority: Constitutional Methodology Architect (CAP027A)
This standard defines the mandatory constitutional procedure for the corrective cycle — the path taken when VERIFICATION_FAIL is issued. It is derived from the REF002 corrective cycle experience (CAP026H → CAP026J → CAP026K) and consolidated as doctrine.
§2 — Triggering Condition
The corrective cycle is triggered when Phase 5 (Verification Execution) issues VERIFICATION_FAIL:
VERIFICATION_FAIL = any P1 BLOCKER test failure, regardless of numeric score.
A non-zero numeric pass rate does not prevent VERIFICATION_FAIL. The P1 BLOCKER gate is independently determinative.
The corrective cycle is NOT triggered by:
- VERIFICATION_PASS_WITH_FINDINGS (non-blocker findings → proceed to Phase 6)
- VERIFICATION_BLOCKED (infrastructure missing → resolve and re-execute Phase 5)
§3 — Corrective Cycle Phases
PHASE 5: VERIFICATION_FAIL issued
R-VEXEC: Documents root causes per P1 BLOCKER
│
▼
PHASE 5a-IMPL: CORRECTIVE IMPLEMENTATION
Role: R-IMPL (MUST be distinct program from Phase 5 R-VEXEC)
Scope: Bounded to root causes identified by Phase 5
Gate: IMPLEMENTATION_COMPLETE
│
▼
PHASE 5a-VERIFY: VERIFICATION RE-EXECUTION
Role: R-VEXEC (MUST be distinct program from Phase 5a-IMPL)
Protocol: Full Phase 3 trial protocol re-executed
Gate: VERIFICATION_PASS / VERIFICATION_PASS_WITH_FINDINGS / VERIFICATION_FAIL
│
├─ PASS / PASS_WITH_FINDINGS ──► Proceed to Phase 6 (Certification)
│
└─ FAIL again ──► Second corrective cycle
(same structure; maximum iterations: Primary Steward decision)§4 — Phase 5a-IMPL: Corrective Implementation
§4.1 — Role
R-IMPL (Implementer). MUST be a distinct program from the Phase 5 verification program that issued VERIFICATION_FAIL. The same Implementer organization/agent may execute Phase 4 and Phase 5a-IMPL — the requirement is program distinctness, not organizational distinctness.
§4.2 — Scope Constraint
Phase 5a-IMPL scope is STRICTLY BOUNDED to:
- Root causes identified in Phase 5 P1 BLOCKER findings
- High-severity non-blocker findings explicitly included in the R-IMPL mandate
- Nothing outside the mandate scope (no opportunistic improvements)
Evidence — REF002: CAP026J was bounded to 4 root causes: RC-A (governance tables), RC-B (acting authority guard), RC-C (history immutability trigger), RC-D (asyncpg bug). High-severity BV-008 was included in mandatory scope. Medium-severity findings (BT-001–003, EX-010) were OUT of scope and correctly excluded.
Why scope matters: Scope creep in corrective implementation introduces new changes that the re-verification protocol was not designed to test. Unbounded corrections may fix known failures while introducing unknown regressions.
§4.3 — Mandatory Deliverables
- Corrective implementation plan (one section per root cause)
- Implementation evidence (per correction: artifacts changed, post-fix test results)
- Regression test results (confirms corrections did not introduce regressions)
- Executive Verdict (IMPLEMENTATION_COMPLETE)
§4.4 — Prohibited Actions
- R-IMPL MUST NOT re-execute the full Phase 3 trial protocol and declare re-verification
- R-IMPL MUST NOT issue a VERIFICATION verdict
- R-IMPL MUST NOT modify constitutional DDL outside RO-series scope
- R-IMPL post-fix tests are EVIDENCE only — they do not constitute re-verification
§5 — Phase 5a-VERIFY: Verification Re-Execution
§5.1 — Role
R-VEXEC (Verification Executor). MUST be a distinct program from Phase 5a-IMPL. The role separation law applies without exception: the Implementer cannot re-verify their own corrections.
§5.2 — Protocol
Re-execute the FULL Phase 3 trial protocol — the same 110 (or domain-equivalent) unconditional tests. The re-execution is not a targeted re-test of the corrected blockers only. Reason: corrections to one area may affect behavior in other areas.
Evidence — REF001 (Stage 0D arc): When MC-004 was not detected (CAP025C), CAP025D (read-only root cause analysis) and then CAP025E (correction) and CAP025F (full ICA re-execution) were required. The full re-execution (not targeted re-test) correctly confirmed that CR-007 fixed MC-004 without regressions.
Evidence — REF002: CAP026K re-executed all 110 unconditional tests. This confirmed GR-001–GR-006, CR-009, AI-006 PASS, AND also confirmed BV-008 regression improvement, AND also confirmed no new regressions in GiST, federation, events, middleware.
§5.3 — P1 BLOCKER Focus
The re-verification MUST produce before/after evidence for each previously failed P1 BLOCKER. The BLOCKER_STATUS_REPORT.md format (from REF002) is the canonical model:
| Blocker | Source | Phase 5 Status | Corrective Action | Phase 5a-VERIFY Status | Evidence |
|---|---|---|---|---|---|
| [ID] | [Finding ref] | FAIL | [What RC-X did] | PASS | [SQL/HTTP evidence] |
§5.4 — Regression Assessment
The re-verification MUST explicitly confirm that all areas that PASSED in Phase 5 continue to PASS. A correction that fixes P1 BLOCKERs while breaking previously passing tests is a REGRESSION_FAIL — a new form of VERIFICATION_FAIL.
§5.5 — Verdicts
| Verdict | Meaning |
|---|---|
| VERIFICATION_PASS | All unconditional tests pass AND 0 P1 BLOCKER failures AND all previously passing tests still pass |
| VERIFICATION_PASS_WITH_FINDINGS | Numeric gate met + 0 P1 BLOCKER failures + non-blocker findings documented |
| VERIFICATION_FAIL | ANY P1 BLOCKER failure or regression failure → trigger another corrective cycle |
§5.6 — Mandatory Deliverables
Same as Phase 5 (see [M6.§1.3]), plus:
- Explicit before/after comparison for each previously failed P1 BLOCKER (BLOCKER_STATUS_REPORT.md)
- FINDING-K-type new findings (new observations discovered during re-execution)
§6 — Second (and Subsequent) Corrective Cycles
If Phase 5a-VERIFY again issues VERIFICATION_FAIL, a second corrective cycle begins. The structure is identical to the first corrective cycle.
Primary Steward notification required after second VERIFICATION_FAIL. Multiple failures may indicate systematic architectural problems requiring the R-ARCH to re-examine the specification, or they may indicate that Root Cause Analysis was under-identified. The Primary Steward determines whether to continue the corrective cycle or constitute a specification revision program.
Maximum iterations: No constitutional maximum is defined. However, each successive VERIFICATION_FAIL requires Primary Steward review of whether the corrective strategy is sound.
§7 — What VERIFICATION_FAIL Does NOT Mean
Per REF002 evidence (CAP026H EXECUTIVE_VERDICT.md §4.3):
- VERIFICATION_FAIL does NOT mean the specification is defective
- VERIFICATION_FAIL does NOT mean the verification architecture is incomplete
- VERIFICATION_FAIL does NOT mean the constitutional process has failed
- VERIFICATION_FAIL means the implementation has constitutional defects that must be corrected
The corrective cycle is a constitutional safety feature, not a constitutional failure. A domain that enters and successfully completes the corrective cycle is constitutionally trustworthy — provided the evidence chain is complete.
§8 — Evidence Chain Continuity
The corrective cycle MUST preserve the full evidence chain:
- Phase 5 evidence: Original VERIFICATION_FAIL evidence is immutable (constitutional historical record)
- Phase 5a-IMPL evidence: Corrective implementation evidence is new, distinct
- Phase 5a-VERIFY evidence: Re-verification evidence is new, distinct, cross-references Phase 5 for comparison
No Phase 5 evidence shall be modified by Phase 5a programs. The historical record of the failure is constitutionally protected.
§9 — Binding Ruling PS-27B-001 — PP-006 and PP-007 Mandatory Scope
Topic: The mandatory character of PP-006 (Corrective Implementation Distinctness) and PP-007 (Evidence-First Remediation Documentation) within a triggered corrective cycle.
Primary Steward Ruling:
PP-006 and PP-007 remain classified TIER-2 PRESUMPTIVE in the methodology (classification is correct: corrective cycle is conditional). However: if a corrective cycle is triggered (VERIFICATION_FAIL), PP-006 and PP-007 are mandatory without exception by operation of the role separation law (CLAUDE.md). No domain-specific override, no Primary Steward exception, and no individual program charter may authorize combined corrective-implementation and re-verification roles within a single program. Any such combination produces a constitutionally void re-verification verdict.
Effective: 2026-06-14
[RATIFIED — Primary Steward, 2026-06-14]
§10 — PP-006: Corrective Implementation Distinctness
Source: CAP026J (distinct from CAP026K); constitutional role separation law
Practice: When a verification program issues VERIFICATION_FAIL, the corrective implementation and re-verification MUST be separate programs with distinct role authorities. The Implementer who made the correction MUST NOT re-verify their own corrections.
Constitutional value: Role separation is a constitutional law. The self-certifying Implementer is the canonical constitutional violation. A corrective loop that merges Implementer and Verifier roles defeats the constitutional guarantee of independent oversight.
Universality assessment: This is a direct consequence of the existing role separation law (CLAUDE.md). It requires explicit restatement as a corrective-cycle doctrine because the law was written without specifying what happens on correction.
Mandate (presumptive → MANDATORY by PS-27B-001): When any REF domain enters a corrective cycle (VERIFICATION_FAIL), re-verification MUST be a distinct program from the corrective implementation. The Implementer's post-fix tests are evidence, not verification. Only the distinct Verifier's test results count toward the re-verification verdict.
§11 — PP-007: Evidence-First Remediation Documentation
Source: CAP026J IMPLEMENTATION_EVIDENCE.md + CAP026K BLOCKER_STATUS_REPORT.md pattern
Practice: For each corrected P1 BLOCKER, BOTH programs produce independent evidence: the corrective program documents what changed; the re-verification program independently observes the corrected behavior. These are separate, cross-verifiable evidence records.
Constitutional value: A single evidence record from the correcting party is insufficient — it cannot distinguish "we tried to fix it" from "it is fixed." Independent observation by the Verifier creates a cross-verifiable chain.
Mandate (presumptive → MANDATORY by PS-27B-001): Corrective programs MUST document each correction with the specific artifact changed and the post-fix test result. Re-verification programs MUST independently observe and document each correction without relying on the corrective program's documentation.
§12 — The REF002 Canonical Corrective Cycle
The REF002 corrective cycle (CAP026H → CAP026J → CAP026K → CAP026L) is the canonical model for corrective cycle execution. Its structure:
| Phase | Program | Role | Verdict |
|---|---|---|---|
| Phase 5 | CAP026H | R-VEXEC | VERIFICATION_FAIL (4 P1 BLOCKERs: GR-001–006, CR-009, AI-006) |
| Phase 5a-IMPL | CAP026J | R-IMPL | IMPLEMENTATION_COMPLETE (4 root causes: RC-A, RC-B, RC-C, RC-D) |
| Phase 5a-VERIFY | CAP026K | R-VEXEC (distinct) | VERIFICATION_PASS_WITH_FINDINGS (110/110 unconditional; 0 P1 BLOCKERs) |
| Phase 6 | CAP026L | R-CERT | CERTIFIED_WITH_OBSERVATIONS (89%) |
The corrective cycle did not compromise REF002's certification. It demonstrated that the constitutional process worked: defects were caught, corrected under bounded scope, independently re-verified with full protocol execution, and independently certified. REF002's certification is constitutionally trustworthy precisely because it went through the corrective cycle — not despite it.
§13 — Role Separation in Corrective Cycles
When VERIFICATION_FAIL triggers a corrective cycle:
| Step | Role | May NOT be combined with |
|---|---|---|
| Identify root causes | R-VEXEC (from the failed verification) | R-IMPL (corrective) |
| Implement corrections | R-IMPL (corrective) | R-VEXEC (re-verify) |
| Re-verify corrections | R-VEXEC (new program) | R-IMPL (corrective) |
| Issue certification | R-CERT (new program) | R-VEXEC (re-verify) or R-IMPL (corrective) |
AI Agent Rule: In the VGSF Engineering constitutional process, AI agents execute constitutional programs. An AI agent executing a corrective implementation program (R-IMPL) MUST NOT in the same conversation also execute re-verification (R-VEXEC). These must be separate conversation turns with separate program constitutions.
Evidence: CAP026J (corrective implementation) and CAP026K (re-verification) were distinct program constitutions, both executed by AI agents, in the same conversation session — but with separate charters, separate role declarations, and separate evidence artifacts.
CORRECTIVE_CYCLE_STANDARD.md | 2026-06-14 | CAP027A — Constitutional Methodology Architect
Constitutional Colophon — M7
This chapter establishes the Corrective Cycle Doctrine — the mandatory constitutional procedure triggered by Phase 5 VERIFICATION_FAIL, comprising Phase 5a-IMPL (Corrective Implementation by a distinct R-IMPL program) and Phase 5a-VERIFY (full trial protocol re-execution by a distinct R-VEXEC program), with role separation preserved throughout and the Phase 5 evidence chain protected as immutable historical record.
It operates within Part B under the governing principle that constitutional trustworthiness — not mere correctness — is the objective of Dharma ERP Constitutional Engineering Methodology V2.1.
Readers proceeding to M8 (Role Separation Doctrine) should carry forward: the corrective cycle's preservation of role separation demonstrates the same principle that M8 establishes in full — constitutional authority cannot be collapsed even under operational pressure, and any verdict produced by a combined role is constitutionally void regardless of the quality of the work.
