Skip to content

VGSF CONSTITUTIONAL TECHNICAL ARCHITECTURE — BOOK II — PART B: CONSTITUTIONAL ENGINEERING METHODOLOGY
Chapter 7 of 8 in this Part

M7 — Corrective Cycle Doctrine

Document record
FieldValue
Constitutional SeriesM — Constitutional Engineering Methodology
Primary SourceCORRECTIVE_CYCLE_STANDARD.md
VersionV2.1 (CAP030C, 2026-06-15)
RatifiedRATIFIED — CAP027B (Methodology V2.0) + CAP030C (V2.1 Phase -1 amendment)
Applies ToREF003–REF014
Position in BookPart B, Chapter 7 of 8

M6 established verification execution and certification. M7 (Corrective Cycle Doctrine) establishes the constitutional path when verification fails — the Phase 5a corrective cycle that preserves role separation through implementation failure and independent re-verification.


§1 — Document Identity and Purpose

Document: CORRECTIVE_CYCLE_STANDARD.md
Date: 2026-06-14
Authority: Constitutional Methodology Architect (CAP027A)

This standard defines the mandatory constitutional procedure for the corrective cycle — the path taken when VERIFICATION_FAIL is issued. It is derived from the REF002 corrective cycle experience (CAP026H → CAP026J → CAP026K) and consolidated as doctrine.


§2 — Triggering Condition

The corrective cycle is triggered when Phase 5 (Verification Execution) issues VERIFICATION_FAIL:

VERIFICATION_FAIL = any P1 BLOCKER test failure, regardless of numeric score.

A non-zero numeric pass rate does not prevent VERIFICATION_FAIL. The P1 BLOCKER gate is independently determinative.

The corrective cycle is NOT triggered by:

  • VERIFICATION_PASS_WITH_FINDINGS (non-blocker findings → proceed to Phase 6)
  • VERIFICATION_BLOCKED (infrastructure missing → resolve and re-execute Phase 5)

§3 — Corrective Cycle Phases

PHASE 5: VERIFICATION_FAIL issued
          R-VEXEC: Documents root causes per P1 BLOCKER
          │
          ▼
PHASE 5a-IMPL: CORRECTIVE IMPLEMENTATION
          Role: R-IMPL (MUST be distinct program from Phase 5 R-VEXEC)
          Scope: Bounded to root causes identified by Phase 5
          Gate: IMPLEMENTATION_COMPLETE
          │
          ▼
PHASE 5a-VERIFY: VERIFICATION RE-EXECUTION
          Role: R-VEXEC (MUST be distinct program from Phase 5a-IMPL)
          Protocol: Full Phase 3 trial protocol re-executed
          Gate: VERIFICATION_PASS / VERIFICATION_PASS_WITH_FINDINGS / VERIFICATION_FAIL
          │
          ├─ PASS / PASS_WITH_FINDINGS ──► Proceed to Phase 6 (Certification)
          │
          └─ FAIL again ──► Second corrective cycle
                            (same structure; maximum iterations: Primary Steward decision)

§4 — Phase 5a-IMPL: Corrective Implementation

§4.1 — Role

R-IMPL (Implementer). MUST be a distinct program from the Phase 5 verification program that issued VERIFICATION_FAIL. The same Implementer organization/agent may execute Phase 4 and Phase 5a-IMPL — the requirement is program distinctness, not organizational distinctness.

§4.2 — Scope Constraint

Phase 5a-IMPL scope is STRICTLY BOUNDED to:

  1. Root causes identified in Phase 5 P1 BLOCKER findings
  2. High-severity non-blocker findings explicitly included in the R-IMPL mandate
  3. Nothing outside the mandate scope (no opportunistic improvements)

Evidence — REF002: CAP026J was bounded to 4 root causes: RC-A (governance tables), RC-B (acting authority guard), RC-C (history immutability trigger), RC-D (asyncpg bug). High-severity BV-008 was included in mandatory scope. Medium-severity findings (BT-001–003, EX-010) were OUT of scope and correctly excluded.

Why scope matters: Scope creep in corrective implementation introduces new changes that the re-verification protocol was not designed to test. Unbounded corrections may fix known failures while introducing unknown regressions.

§4.3 — Mandatory Deliverables

  • Corrective implementation plan (one section per root cause)
  • Implementation evidence (per correction: artifacts changed, post-fix test results)
  • Regression test results (confirms corrections did not introduce regressions)
  • Executive Verdict (IMPLEMENTATION_COMPLETE)

§4.4 — Prohibited Actions

  • R-IMPL MUST NOT re-execute the full Phase 3 trial protocol and declare re-verification
  • R-IMPL MUST NOT issue a VERIFICATION verdict
  • R-IMPL MUST NOT modify constitutional DDL outside RO-series scope
  • R-IMPL post-fix tests are EVIDENCE only — they do not constitute re-verification

§5 — Phase 5a-VERIFY: Verification Re-Execution

§5.1 — Role

R-VEXEC (Verification Executor). MUST be a distinct program from Phase 5a-IMPL. The role separation law applies without exception: the Implementer cannot re-verify their own corrections.

§5.2 — Protocol

Re-execute the FULL Phase 3 trial protocol — the same 110 (or domain-equivalent) unconditional tests. The re-execution is not a targeted re-test of the corrected blockers only. Reason: corrections to one area may affect behavior in other areas.

Evidence — REF001 (Stage 0D arc): When MC-004 was not detected (CAP025C), CAP025D (read-only root cause analysis) and then CAP025E (correction) and CAP025F (full ICA re-execution) were required. The full re-execution (not targeted re-test) correctly confirmed that CR-007 fixed MC-004 without regressions.

Evidence — REF002: CAP026K re-executed all 110 unconditional tests. This confirmed GR-001–GR-006, CR-009, AI-006 PASS, AND also confirmed BV-008 regression improvement, AND also confirmed no new regressions in GiST, federation, events, middleware.

§5.3 — P1 BLOCKER Focus

The re-verification MUST produce before/after evidence for each previously failed P1 BLOCKER. The BLOCKER_STATUS_REPORT.md format (from REF002) is the canonical model:

BlockerSourcePhase 5 StatusCorrective ActionPhase 5a-VERIFY StatusEvidence
[ID][Finding ref]FAIL[What RC-X did]PASS[SQL/HTTP evidence]

§5.4 — Regression Assessment

The re-verification MUST explicitly confirm that all areas that PASSED in Phase 5 continue to PASS. A correction that fixes P1 BLOCKERs while breaking previously passing tests is a REGRESSION_FAIL — a new form of VERIFICATION_FAIL.

§5.5 — Verdicts

VerdictMeaning
VERIFICATION_PASSAll unconditional tests pass AND 0 P1 BLOCKER failures AND all previously passing tests still pass
VERIFICATION_PASS_WITH_FINDINGSNumeric gate met + 0 P1 BLOCKER failures + non-blocker findings documented
VERIFICATION_FAILANY P1 BLOCKER failure or regression failure → trigger another corrective cycle

§5.6 — Mandatory Deliverables

Same as Phase 5 (see [M6.§1.3]), plus:

  • Explicit before/after comparison for each previously failed P1 BLOCKER (BLOCKER_STATUS_REPORT.md)
  • FINDING-K-type new findings (new observations discovered during re-execution)

§6 — Second (and Subsequent) Corrective Cycles

If Phase 5a-VERIFY again issues VERIFICATION_FAIL, a second corrective cycle begins. The structure is identical to the first corrective cycle.

Primary Steward notification required after second VERIFICATION_FAIL. Multiple failures may indicate systematic architectural problems requiring the R-ARCH to re-examine the specification, or they may indicate that Root Cause Analysis was under-identified. The Primary Steward determines whether to continue the corrective cycle or constitute a specification revision program.

Maximum iterations: No constitutional maximum is defined. However, each successive VERIFICATION_FAIL requires Primary Steward review of whether the corrective strategy is sound.


§7 — What VERIFICATION_FAIL Does NOT Mean

Per REF002 evidence (CAP026H EXECUTIVE_VERDICT.md §4.3):

  • VERIFICATION_FAIL does NOT mean the specification is defective
  • VERIFICATION_FAIL does NOT mean the verification architecture is incomplete
  • VERIFICATION_FAIL does NOT mean the constitutional process has failed
  • VERIFICATION_FAIL means the implementation has constitutional defects that must be corrected

The corrective cycle is a constitutional safety feature, not a constitutional failure. A domain that enters and successfully completes the corrective cycle is constitutionally trustworthy — provided the evidence chain is complete.


§8 — Evidence Chain Continuity

The corrective cycle MUST preserve the full evidence chain:

  • Phase 5 evidence: Original VERIFICATION_FAIL evidence is immutable (constitutional historical record)
  • Phase 5a-IMPL evidence: Corrective implementation evidence is new, distinct
  • Phase 5a-VERIFY evidence: Re-verification evidence is new, distinct, cross-references Phase 5 for comparison

No Phase 5 evidence shall be modified by Phase 5a programs. The historical record of the failure is constitutionally protected.


§9 — Binding Ruling PS-27B-001 — PP-006 and PP-007 Mandatory Scope

Topic: The mandatory character of PP-006 (Corrective Implementation Distinctness) and PP-007 (Evidence-First Remediation Documentation) within a triggered corrective cycle.

Primary Steward Ruling:

PP-006 and PP-007 remain classified TIER-2 PRESUMPTIVE in the methodology (classification is correct: corrective cycle is conditional). However: if a corrective cycle is triggered (VERIFICATION_FAIL), PP-006 and PP-007 are mandatory without exception by operation of the role separation law (CLAUDE.md). No domain-specific override, no Primary Steward exception, and no individual program charter may authorize combined corrective-implementation and re-verification roles within a single program. Any such combination produces a constitutionally void re-verification verdict.

Effective: 2026-06-14
[RATIFIED — Primary Steward, 2026-06-14]


§10 — PP-006: Corrective Implementation Distinctness

Source: CAP026J (distinct from CAP026K); constitutional role separation law

Practice: When a verification program issues VERIFICATION_FAIL, the corrective implementation and re-verification MUST be separate programs with distinct role authorities. The Implementer who made the correction MUST NOT re-verify their own corrections.

Constitutional value: Role separation is a constitutional law. The self-certifying Implementer is the canonical constitutional violation. A corrective loop that merges Implementer and Verifier roles defeats the constitutional guarantee of independent oversight.

Universality assessment: This is a direct consequence of the existing role separation law (CLAUDE.md). It requires explicit restatement as a corrective-cycle doctrine because the law was written without specifying what happens on correction.

Mandate (presumptive → MANDATORY by PS-27B-001): When any REF domain enters a corrective cycle (VERIFICATION_FAIL), re-verification MUST be a distinct program from the corrective implementation. The Implementer's post-fix tests are evidence, not verification. Only the distinct Verifier's test results count toward the re-verification verdict.


§11 — PP-007: Evidence-First Remediation Documentation

Source: CAP026J IMPLEMENTATION_EVIDENCE.md + CAP026K BLOCKER_STATUS_REPORT.md pattern

Practice: For each corrected P1 BLOCKER, BOTH programs produce independent evidence: the corrective program documents what changed; the re-verification program independently observes the corrected behavior. These are separate, cross-verifiable evidence records.

Constitutional value: A single evidence record from the correcting party is insufficient — it cannot distinguish "we tried to fix it" from "it is fixed." Independent observation by the Verifier creates a cross-verifiable chain.

Mandate (presumptive → MANDATORY by PS-27B-001): Corrective programs MUST document each correction with the specific artifact changed and the post-fix test result. Re-verification programs MUST independently observe and document each correction without relying on the corrective program's documentation.


§12 — The REF002 Canonical Corrective Cycle

The REF002 corrective cycle (CAP026H → CAP026J → CAP026K → CAP026L) is the canonical model for corrective cycle execution. Its structure:

PhaseProgramRoleVerdict
Phase 5CAP026HR-VEXECVERIFICATION_FAIL (4 P1 BLOCKERs: GR-001–006, CR-009, AI-006)
Phase 5a-IMPLCAP026JR-IMPLIMPLEMENTATION_COMPLETE (4 root causes: RC-A, RC-B, RC-C, RC-D)
Phase 5a-VERIFYCAP026KR-VEXEC (distinct)VERIFICATION_PASS_WITH_FINDINGS (110/110 unconditional; 0 P1 BLOCKERs)
Phase 6CAP026LR-CERTCERTIFIED_WITH_OBSERVATIONS (89%)

The corrective cycle did not compromise REF002's certification. It demonstrated that the constitutional process worked: defects were caught, corrected under bounded scope, independently re-verified with full protocol execution, and independently certified. REF002's certification is constitutionally trustworthy precisely because it went through the corrective cycle — not despite it.


§13 — Role Separation in Corrective Cycles

When VERIFICATION_FAIL triggers a corrective cycle:

StepRoleMay NOT be combined with
Identify root causesR-VEXEC (from the failed verification)R-IMPL (corrective)
Implement correctionsR-IMPL (corrective)R-VEXEC (re-verify)
Re-verify correctionsR-VEXEC (new program)R-IMPL (corrective)
Issue certificationR-CERT (new program)R-VEXEC (re-verify) or R-IMPL (corrective)

AI Agent Rule: In the VGSF Engineering constitutional process, AI agents execute constitutional programs. An AI agent executing a corrective implementation program (R-IMPL) MUST NOT in the same conversation also execute re-verification (R-VEXEC). These must be separate conversation turns with separate program constitutions.

Evidence: CAP026J (corrective implementation) and CAP026K (re-verification) were distinct program constitutions, both executed by AI agents, in the same conversation session — but with separate charters, separate role declarations, and separate evidence artifacts.


CORRECTIVE_CYCLE_STANDARD.md | 2026-06-14 | CAP027A — Constitutional Methodology Architect


Constitutional Colophon — M7
This chapter establishes the Corrective Cycle Doctrine — the mandatory constitutional procedure triggered by Phase 5 VERIFICATION_FAIL, comprising Phase 5a-IMPL (Corrective Implementation by a distinct R-IMPL program) and Phase 5a-VERIFY (full trial protocol re-execution by a distinct R-VEXEC program), with role separation preserved throughout and the Phase 5 evidence chain protected as immutable historical record.
It operates within Part B under the governing principle that constitutional trustworthiness — not mere correctness — is the objective of Dharma ERP Constitutional Engineering Methodology V2.1.
Readers proceeding to M8 (Role Separation Doctrine) should carry forward: the corrective cycle's preservation of role separation demonstrates the same principle that M8 establishes in full — constitutional authority cannot be collapsed even under operational pressure, and any verdict produced by a combined role is constitutionally void regardless of the quality of the work.


Test Dharma ERP and tell us what you find.

The trial uses sandboxed demo data across twelve core modules. Look around, try the forms, and review what works and what does not.