M3 — Phase 0: Readiness Assessment
Document record
| Field | Value |
|---|---|
| Constitutional Series | M — Constitutional Engineering Methodology |
| Primary Source | CONSTITUTIONAL_LIFECYCLE_STANDARD.md + FOUNDATION_G5_DOMAIN_LIFECYCLE_MODEL.md |
| Version | V2.1 (CAP030C, 2026-06-15) |
| Ratified | RATIFIED — CAP027B (Methodology V2.0) + CAP030C (V2.1 Phase -1 amendment) |
| Applies To | REF003–REF014 |
| Position in Book | Part B, Chapter 3 of 8 |
M2 established the Phase -1 gate — the domain has been classified and admitted. M3 (Phase 0: Readiness Assessment) establishes what happens next: a systematic assessment of whether the domain is ready to be specified.
§1 — Phase 0 Constitutional Position
Phase 0 is the first phase of the forward lifecycle after Phase -1 admission. Its role is the Constitutional Architect (R-ARCH). It produces the readiness determination that either authorizes Phase 1 to begin (READY or READY_WITH_CONSTRAINTS) or identifies what must be remediated before specification may begin (NOT_READY).
Phase 0 is a gate, not a specification. R-ARCH in Phase 0 assesses readiness; R-ARCH in Phase 1 produces the specification. The distinction matters: a Phase 0 program that begins producing specification artifacts has violated its constitutional scope.
§2 — Phase 0 Specification
Role: R-ARCH (Constitutional Architect)
Entry condition: Domain has cleared Phase -1 (ADMIT verdict; five mandatory artifacts present; see [M2.§3]). Domain has received constitutional benchmark designation (CBD) with no dimension below ADEQUATE (UP-006).
§2.1 — Mandatory Deliverables
- Artifact inventory summary
- Constitutional state verification (freeze chain, invariant enforcement)
- Benchmark assessment
- Gap analysis against service specification prerequisites
- Adaptation assessment for service layer
§2.2 — Gate Criteria
| Verdict | Meaning |
|---|---|
| READY | All prerequisites met; service specification may begin immediately |
| READY_WITH_CONSTRAINTS | Prerequisites substantially met; named constraints must be resolved within Phase 1 |
| NOT_READY | Prerequisites not met; remediation program required before Phase 1 |
§2.3 — Prohibited Actions in Phase 0
- Producing specification work
- Constituting implementation work
- Issuing certification
§3 — Phase 0 Gate Validation
The following gate validations MUST be confirmed before proceeding from Phase 0 to Phase 1:
| From Phase | To Phase | Gate validation required |
|---|---|---|
| 0 → 1 | Readiness → Specification | Benchmark designation confirmed; no below-ADEQUATE dimensions |
Entry condition for Phase 1: Phase 0 READY or READY_WITH_CONSTRAINTS. → See: [M4.§2] — Phase 1 entry condition
§4 — Constitutional Benchmark Gate (UP-006)
Before Phase 0 may be entered, the domain must have received a formal constitutional benchmark designation (CBD). This is the UP-006 Universal Practice, confirmed by both REF001 and REF002 lifecycles.
Evidence — REF001: CBD-REF001-2026-001 (92.7%) was issued by CAP023D Phase C before CAP023E specified the service layer. Benchmark assessed 10 dimensions; no dimension below ADEQUATE before specification began.
Evidence — REF002: CBD-REF002-2026-001 (87.3%) was issued by CAP021C before CAP026B assessed service readiness. CAP026B explicitly referenced the benchmark as the entry gate. Benchmark score of 87.3% — no dimension below ADEQUATE — cleared the readiness gate.
Constitutional value: The benchmark quantifies constitutional corpus completeness before specification investment begins. It prevents premature service specification on an insufficiently constituted domain, which would produce a specification that cannot be verified against the constitution.
Mandate for REF003–REF014:
Every REF domain MUST receive a formal constitutional benchmark designation (CBD) before its service layer specification begins. Minimum benchmark: no dimension below ADEQUATE (≥3). Any dimension scoring MARGINAL or DEFICIENT MUST be resolved before the benchmark gate clears.
§5 — Phase 0 in the G5 Domain Lifecycle Model
The G5 Domain Lifecycle Model (FOUNDATION_G5_DOMAIN_LIFECYCLE_MODEL.md) establishes Phase 0 readiness assessment as corresponding to the DISCOVERING state (State 1) plus its transition into ONTOLOGY_DESIGN, insofar as Phase 0 assesses the constitutional readiness of the existing domain corpus before service-layer specification begins.
§5.1 — Constitutional State Verification in Phase 0
The Phase 0 Constitutional Architect must assess the domain's position in the G5 lifecycle. The following state assessments apply:
FROZEN state assessment: If the domain is FROZEN, its schema structure is immutable (G5-L-LIFE-001, G5-L-LIFE-003). Phase 0 MUST confirm:
- The constitutional freeze declaration exists and is ratified
- The benchmark designation confirms no dimension below ADEQUATE
- All constitutional invariants documented in the G3.5 constitution are enforceable
- The service specification may proceed against a stable, immutable constitutional foundation
CERTIFIED (not yet FROZEN) state assessment: If the domain is CERTIFIED but not FROZEN, Phase 0 MUST note this constraint explicitly. The readiness verdict may be READY_WITH_CONSTRAINTS, identifying the constraint that the freeze declaration must be ratified before Phase 1 specification work is finalized.
Earlier state assessment (below CERTIFIED): If the domain is in any state earlier than CERTIFIED (DISCOVERING, ONTOLOGY_DESIGN, CONSTITUTIONALLY_RATIFIED, ARCHITECTURE_DESIGN, DDL_ENGINEERING, CERTIFYING), Phase 0 MUST issue NOT_READY. A domain below CERTIFIED state does not have a stable constitutional foundation against which a service specification can be written.
§5.2 — The Evidence Rule at Phase 0
The G5 Evidence Rule (G5-L-DE-005) applies at Phase 0:
No domain stage may be passed by assertion alone. Every design decision must be backed by: (a) evidence from the constitutional source corpus, (b) evidence from the historical SQL corpus, (c) direct PostgreSQL execution evidence, or (d) formal adversarial analysis.
The Phase 0 constitutional state verification MUST produce evidence — not assertion — that the constitutional foundation is sound. A Phase 0 assessment that declares READY on the basis of "the domain appears to be frozen" without checking the freeze declaration is constitutionally insufficient.
§6 — Phase 0 Program Charter Requirements
Each Phase 0 program MUST produce a PROGRAM_CHARTER.md that includes:
Program ID: [CAPXXX_y]
Authority: R-ARCH (Constitutional Architect) only.
This program is NOT authorized to act as:
- R-REVIEW (Independent Specification Reviewer)
- R-VARCH (Verification Architect)
- R-IMPL (Implementer)
- R-VEXEC (Verification Executor)
- R-CERT (Independent Certifier)
- R-HIST (Historian)
Predecessors: [Phase -1 admission program; CBD designation program]
Abort conditions: [Domain-specific; at minimum: Phase -1 artifacts absent]§7 — Blocker vs. Observation Distinction
Phase 0 identifies two categories of findings:
BLOCKER: A finding that prevents Phase 0 from issuing READY or READY_WITH_CONSTRAINTS. The Phase 0 verdict is NOT_READY. A remediation program must resolve all blockers before Phase 0 can be re-executed.
OBSERVATION: A finding that is noted in the Phase 0 deliverables but does not prevent READY_WITH_CONSTRAINTS. The observation is carried forward into Phase 1 as a named constraint that must be addressed within Phase 1.
The distinction is constitutional: a blocker closes the Phase 0 gate. An observation passes through the gate with the domain.
Example (REF002 analogy): If a domain's G3.5 constitution has not yet been compiled (and the benchmark therefore cannot assess the G3.5 layer), this is a BLOCKER — the domain cannot demonstrate constitutional corpus completeness without it. If a domain's G3.5 constitution is complete but a specific invariant has an open clarification question, this may be an OBSERVATION that is resolved in Phase 1.
§8 — Phase 0 Succession Rule
When Phase 0 issues NOT_READY, the domain does not enter Phase 1. Instead, a remediation program is constituted to address the identified blockers. The remediation program is NOT a Phase 0 re-execution — it is a distinct program with a distinct scope (resolve the identified blockers). Once the remediation program closes, Phase 0 is re-executed and re-evaluated.
This succession preserves the historical record: the original NOT_READY verdict and the remediation program are both preserved as immutable evidence. Phase 0 re-execution produces new evidence rather than modifying the original.
CONSTITUTIONAL_LIFECYCLE_STANDARD.md — Phase 0 specification | 2026-06-14 | CAP027AFOUNDATION_G5_DOMAIN_LIFECYCLE_MODEL.md — G5 lifecycle state model | Constitutional Architecture Council
Constitutional Colophon — M3
This chapter establishes Phase 0 (Readiness Assessment) as the first mandatory phase of the forward lifecycle after Phase -1 admission — the systematic assessment by R-ARCH of whether a domain's constitutional corpus is sufficiently complete, frozen, and benchmarked to support service layer specification.
It operates within Part B under the governing principle that constitutional trustworthiness — not mere correctness — is the objective of Dharma ERP Constitutional Engineering Methodology V2.1.
Readers proceeding to M4 (Phases 1–2: Specification and Review) should carry forward: Phase 0's READY or READY_WITH_CONSTRAINTS verdict is the constitutional authorization for Phase 1 to begin — without it, specification is constitutionally unauthorized regardless of the architect's conviction that the domain is ready.